…its innovative tension cable and fabric membrane roofing system, recently installed on Jaber Al-Ahmad International Stadium in Safat, Kuwait. The Birdair project competed in the 60th annual International Achievement Awards,…
…Aquarium of the Pacific – Southern California’s largest aquarium and the fourth largest in the nation – now benefits from a tensioned membrane canopy system designed, engineered and installed by…
…Inc. was awarded the Piscina Olympica roofing subcontract to remove the existing roof, install the new perimeter clamping and to install the PTFE roof. The aquatic facility features an Olympic-sized…
…and setbacks that we were able to eliminate by working so closely with our subsidiaries at TME.” The project was awarded to TME in late 2006. Birdair crews began installation…
Birdair, Inc. Awarded Talisman Centre Roofing Contract Birdair to Install World’s Second TensothermTM with Nanogel® Roofing System Published: August 10, 2009 Birdair, Inc., the leading specialty contractor of lightweight long-span…
…supplied TiO2 – coated PTFE, a Teflon®-coated woven fiberglass membrane for the facility. Taiyo Birdair do Brazil, a subsidiary of Birdair, was responsible for installing the PTFE tensile membrane. TiO2…
…of tensile architecture, so prevalent in shelter applications, and translates it into an elegant solution for the building envelope environment.” Tensotherm was recently installed at the Dedmon Athletic Center at…
…membrane that will make up the facility’s 141,000 square-foot tensile roofing system., which TBB will install. TiO2 (titanium dioxide) is a non-toxic and flame-resistant coating applied to the fiberglass membrane…
…project consists of the design, fabrication and supply of the PVC membrane and clamping. Installation will be in the work scope of the general contractor, A2 Group while Birdair will…
…facility. Birdair will design, fabricate and install four structures comprised of 60,000 square feet of PTFE, a Teflon®-coated woven fiberglass membrane. These will be located at the exit and entry…
…claim, ticketing and curbside areas. The airport has chosen Birdair to manage the design, fabrication and installation of the three membrane structures. The challenge for Sarasota-Bradenton has always been winning…
…and retains warmer air in cold exterior conditions, which is key for Wisconsin’s climate. “Before the installation crew stepped foot on the roof, Birdair had an excellent plan established,” says…