…varying climate zones. Birdair’s ability to overcome design and engineering challenges that other specialty contractors would not have been able to meet was vital to the project’s success. “One of…
…scheduling, Birdair provides design-build solutions in all aspects of project design, engineering, installation and maintenance. The company offers a selection of architectural fabric membranes, including PTFE fiberglass, ETFE film, PVC…
…for the fall of 2010. The Tensotherm composite roofing system can contribute to US Green Building Council (USGBC) Leadership in Energy and Environmental Design (LEED®) credits in the categories of…
…all aspects of project design, engineering, installation and maintenance. The company offers a selection of architectural fabric membranes, including PTFE fiberglass, ETFE film, PVC and Tensotherm™. Birdair, based in Buffalo,…
…Birdair (design and fabric installation), structural engineering firm WSP USA, Mueser Rutledge Consulting Engineers (for geo-tech engineering) and general contractor Hunter Roberts Construction Group. An Icon of Revitalization Over the…
…to pre-construction services such as design assistance, budgeting, construction methodologies and project scheduling, Birdair provides design-build solutions in all aspects of project design, engineering, installation and maintenance. The company offers…
…facilities, each of which features its own unique roof design. Birdair was chosen due to its extensive experience and knowledge of complex design, engineering and construction of tensile roofing in…
…addition to Birdair, the project team consists of Architect GMP Architects, Cape Town, South Africa, and Engineer Schlaich Bergermann und Partner, Stuttgart, Germany and Pfeifer Seilban, Memringen, Germany. To date,…
…ceremony honoring architect Frei Otto was held May 16th beneath a Birdair open-air, hyperbola shaped, 1,000-square-foot PVC membrane structure, designed as a replica of a stunning, 1955 Frei Otto canopy…
…the world. In addition to pre-construction services such as design assistance, budgeting, construction methodologies and project scheduling, Birdair provides design-build solutions in all aspects of project design, engineering, installation and…
…will sit on massive concrete bases, each of which will be supported by 20 piles driven 150 to 200 feet deep. The lightweight PTFE roof will close from two sides,…
…Outlet, NIKE Factory Store, Calvin Klein Outlet and Michael Kors Outlet. Outlet Collection at Niagara is the largest open-air outlet mall in Canada. Additionally, its size and development costs, approaching…