…Birdair (design and fabric installation), structural engineering firm WSP USA, Mueser Rutledge Consulting Engineers (for geo-tech engineering) and general contractor Hunter Roberts Construction Group. An Icon of Revitalization Over the…
…developing this solution and in addition, fabricated and installed the new, aesthetically pleasing, iconic PTFE membrane roof at the South wall of the terminal. “Due to the roof’s large surface…
…project consists of the design, fabrication and supply of the PVC membrane and clamping. Installation will be in the work scope of the general contractor, A2 Group while Birdair will…
…and retains warmer air in cold exterior conditions, which is key for Wisconsin’s climate. “Before the installation crew stepped foot on the roof, Birdair had an excellent plan established,” says…
…also a more economical roofing option than other conventional roofing materials. Since its installation in July 1973, Birdair has helped the University of La Verne maintain the PTFE fabric roofing…
…two sail-shaped canopies will be the first vision to greet them. Published: July 31, 2014 Birdair’s scope of work included design, fabrication, supply and installation of two new PTFE membrane…
…protection from the weather.” The stadium was designed by architectural firm The Estopinal Group with Abel Construction general contractor. Birdair’s scope of work included design, fabrication, supply and installation of…
…and setbacks that we were able to eliminate by working so closely with our subsidiaries at TME.” The project was awarded to TME in late 2006. Birdair crews began installation…
…for shipping and installation. Like traditional fabric architecture, which is installed in tension through principles of tensile architecture, Tensotherm’s light weight and freedom of form allows for unlimited design possibilities….
…claim, ticketing and curbside areas. The airport has chosen Birdair to manage the design, fabrication and installation of the three membrane structures. The challenge for Sarasota-Bradenton has always been winning…
…ETFE film cladding system. Approximately 300,000 sq. ft. of Birdair’s single-layer ETFE film with reinforcement cables will be installed at NTO’s Arrivals and Departures canopies. Birdair’s scope of work for…
…Birdair’s project scope includes design, engineering, fabrication and installation of the main structural steel, fabric roof, cables, catwalks and attachment hardware. The amphitheater roof will consist of a combination of…