…wide – will be installed at the bus shelter, and one canopy – 80’ long x 36.5’ wide – will be installed at the lot’s entrance. One existing fabric canopy…
…of Construction, Birdair. “We’re proud of the fact that the installation challenge was met, with our crew installing all the structural steel before students and staff returned from the break.”…
…courses, and renovating buildings for the 2008-2009 school year, and Birdair, Inc. has recently been awarded the project to install the roof of the campus’ sports and athletic facility, the…
…light, airy roof that looks aesthetically pleasing and visually engaging both for the performances it will host and simply as part of the park setting. A 14-man Birdair installation crew…
…small, so they needed to fit perfectly to avoid wrinkling. “We designed adjustments in the corners to produce a really nice corner detail, resulting in a smooth installation process. The…
Birdair Elevates Partnership with Rita Rossi Colwell Center with Plans for New Tensotherm™ Roof Birdair to replace original PTFE roofing system installed at UMBC facility in 1994 Birdair, Inc., the…
…roofing subcontractor for the facility, fabricating and installing a new roof on an aggressive five-month timeline after a snow and ice storm caused the facility’s previous roof to deflate in…
World Cup Venue to Feature Birdair’s PTFE Membrane, ETFE Film and Tensotherm™ – Insulated Tensioned Membrane Taiyo Middle East, a Birdair subsidiary, to provide the design, fabrication, supply, and installation…
…from Nov. 21 to Dec. 18. Taiyo Middle East, a Birdair subsidiary based in Dubai, designed, fabricated, supplied and installed the sustainable membrane roof system for the stadium during its…
…structures, minimizing material usage and cost, and reduces energy consumption for shipping and installation. Like traditional fabric architecture, which is installed in tension through principles of tensile architecture, Tensotherm’ s…
…In 2012, Birdair designed, fabricated and installed four tensile structures, comprised of 60,000 square feet of PTFE membrane, located at the exit and entry points of the parking facility. In…
…Leo A. Daly Architecture Firm. Heery International is working as the general contractor, architect and engineer on the project. Birdair’s scope of work includes design, fabrication, supply and installation of…