…for shipping and installation. Like traditional fabric architecture, which is installed in tension through principles of tensile architecture, Tensotherm’s light weight and freedom of form allows for unlimited design possibilities….
…and setbacks that we were able to eliminate by working so closely with our subsidiaries at TME.” The project was awarded to TME in late 2006. Birdair crews began installation…
…project consists of the design, fabrication and supply of the PVC membrane and clamping. Installation will be in the work scope of the general contractor, A2 Group while Birdair will…
…Birdair’s project scope includes design, engineering, fabrication and installation of the main structural steel, fabric roof, cables, catwalks and attachment hardware. The amphitheater roof will consist of a combination of…
Birdair, Inc. Awarded Talisman Centre Roofing Contract Birdair to Install World’s Second TensothermTM with Nanogel® Roofing System Published: August 10, 2009 Birdair, Inc., the leading specialty contractor of lightweight long-span…
…claim, ticketing and curbside areas. The airport has chosen Birdair to manage the design, fabrication and installation of the three membrane structures. The challenge for Sarasota-Bradenton has always been winning…
…ETFE film cladding system. Approximately 300,000 sq. ft. of Birdair’s single-layer ETFE film with reinforcement cables will be installed at NTO’s Arrivals and Departures canopies. Birdair’s scope of work for…
…membrane that will make up the facility’s 141,000 square-foot tensile roofing system., which TBB will install. TiO2 (titanium dioxide) is a non-toxic and flame-resistant coating applied to the fiberglass membrane…
…protection from the weather.” The stadium was designed by architectural firm The Estopinal Group with Abel Construction general contractor. Birdair’s scope of work included design, fabrication, supply and installation of…
…and retains warmer air in cold exterior conditions, which is key for Wisconsin’s climate. “Before the installation crew stepped foot on the roof, Birdair had an excellent plan established,” says…
…two sail-shaped canopies will be the first vision to greet them. Published: July 31, 2014 Birdair’s scope of work included design, fabrication, supply and installation of two new PTFE membrane…
…capacity stadium is expected in mid 2011. The facility is being built to accommodate an AFL oval, ICC-compliant cricket oval, provision to allow future installation of IAAF Athletics field and…