…is a thermoplastic, this membrane can be softened into a semi-solid state and infused with UV light inhibitors and anti-soiling fungicides. During installation, multiple sheets of the fabric can be…
…thermal performance while maximizing natural daylighting. Birdair will complete the world’s second Tensotherm installation at Talisman Centre in Calgary, Alberta, Canada in early 2011. Compared to the facility’s previous roof…
…to the design, fabrication and installation of the new tensile fabric structures, the 2016 US Open events will benefit from enhanced shading and a reinvented iconic aesthetic, all without sacrificing…
…building and a winter installation. Thanks to good fortune, a mild winter and excellent work by our subcontractors, which included fabrication by Taiyo, we were able to overcome these challenges…
…process. Architects were eager to learn more about Birdair’s role in all aspects of project design, engineering, installation and maintenance of long-span roofing systems and tensile architecture structures. Notable Birdair…
…layer that significantly enhances the material’s thermal performance while maximizing natural daylighting. Birdair recently completed the installation of a Tensotherm tensile roofing system for the Talisman Centre for Sport and…
…creativity, sustainability, and respect for the environment. As the project’s roofing subcontractor, Birdair designed, fabricated and oversaw the installation of the cable structure and fabric roof for the South American…
…entertainment, the Empire City Casino installation of ETFE incorporates custom-colored LED lighting, creating a truly energizing and exciting experience for guests. The film is UV transparent. Therefore, exposure to UV…
…architecture, Birdair features a comprehensive range of pre-construction services including design assistance, budgeting, construction methodologies and project schedule development. Birdair’s in-house capabilities include design development, engineering, fabrication, construction (installation) and…
…conducted by experienced personnel who are continually trained and updated on the latest installation and maintenance techniques required in the custom tensile structure industry. Birdair clients enter into a post-project…
…typical installation of façade systems, this construction was challenging in that it required access via ropes. This was overcome through the experienced workmanship and coordination of the high-level rope-access workers….
…throughout the world, completed the engineering, fabrication, shipping and installation — on time and on budget — in less than 11 months. In addition, Birdair materials delivered included highly translucent…